Durration: 1 week
Tasks: At the close of every 24 hour cycle:
A) Trace the path of travel over an Orthographic projection Map.
B)Swab the bottom of the shoes & impregnate a sterile growing medium with the traces of topography as recorded from ambulatory travel patterns.
|